As Data Center Infrastructure Expands, Efficiency and Reliability Take Center Stage

Image Author
Neteon
Image Blog

Powering the Digital Economy: Expanding Data Center Infrastructure (DCI) for Maximum Efficiency

In today’s digital-first world, nearly every online interaction, from streaming your favorite shows to managing corporate data from a home office, relies on data center infrastructure (DCI). As the backbone of the digital economy, DCI must continually evolve to meet the growing demands of businesses and consumers alike. Ensuring continuous uptime and efficiency in data center operations is critical—not just for the operators but for the digital economy as a whole. Downtime is costly, making efficient and resilient infrastructure expansion a top priority for any data center.

The Cost of Running Our Digital World

The operational expenses of a data center are primarily driven by two major factors: power usage and cooling systems. These account for the majority of construction costs in new facilities and contribute significantly to ongoing operational expenses. For large-scale data centers, the building cost can run into the hundreds of millions of dollars, with power and cooling taking up the largest share. Every improvement in these areas translates directly into substantial cost savings, making efficiency a core focus for operators.

With unpredictable and fluctuating customer demand, operators must be ready for data center expansion at any moment. This requires pre-installing power, cooling, and monitoring equipment before adding additional servers and networking devices, creating a complex and cost-sensitive balancing act. By optimizing power consumption and cooling efficiency, data centers not only reduce operational costs but also contribute to sustainability initiatives, especially in regions like North America and Europe, where upgrading legacy equipment is crucial.

Two Key Challenges in DCI Expansion

As data centers grow, maintaining operational efficiency and uptime becomes a critical challenge. Operators face two major hurdles when expanding infrastructure:

  • Minimizing downtime: Adding new equipment can disrupt the existing network. Installation, testing, and reconfiguration may cause part or even the entire network to experience downtime. For Tier IV data centers, which require 99.995% availability, downtime is extremely costly, with less than 25 minutes of allowable downtime per year.
  • Connecting systems with different communication protocols: Data centers rely on a variety of systems, from power meters to HVAC controls, each using different communication protocols. Integrating these disparate systems into the Data Center Infrastructure Management (DCIM) system requires significant effort, often involving complex system reconfigurations and testing.

How to Minimize Disruptions in Data Center Operations

To address these challenges, data center operators must prioritize three key factors when expanding infrastructure: flexibility, redundancy, and interoperability.

  • Flexibility: A modular approach is essential for efficient data center expansion. Modular solutions, such as the Micro Modular Data Center (MMDC), allow operators to add only the components they need—whether it’s additional sensors, controls, or power and cooling modules. This modularity ensures that expansions can be tailored to specific needs without disrupting existing operations.
  • Redundancy: Building redundancy into your network is vital for minimizing downtime during expansions. A redundant networkprovides a backup path, ensuring that operations continue uninterrupted even when new systems are being integrated. This approach helps ensure the data center remains operational while upgrades are underway, avoiding costly downtime.
DCI redundancy
  • Interoperability: One of the biggest challenges in DCI expansion is integrating legacy systems with new equipment. Replacing legacy devices is often impractical, so finding a way to bridge the gap is essential. Using industrial protocol converters, such as a BACnet-to-Modbus converter, ensures that the DCIM system can effectively monitor and control all critical equipment, regardless of the communication protocols used. This seamless interoperability allows data centers to upgrade efficiently without overhauling existing infrastructure.

Ensuring a Smooth Expansion for Maximum Uptime

Expanding DCI is like refueling a plane in mid-air—it’s complex and must be done without interrupting operations. Any mistakes during expansion could lead to substantial financial losses and operational disruptions. Given that power and cooling systems account for the largest share of construction and operational costs, selecting the right equipment and developing a well-thought-out project plan are essential for a successful expansion.

By focusing on flexibility, redundancy, and interoperability, data center operators can avoid costly pitfalls and ensure smooth, efficient expansions that meet the growing demands of the digital economy.

Conclusion: Future-Proofing Your Data Center with Smart Solutions

Data center infrastructure is the foundation of the digital economy, and expanding this infrastructure must be done with precision and care. By leveraging modular designs, building in redundancy, and ensuring seamless integration of legacy and new systems, operators can enhance efficiency, reduce costs, and maintain the uptime that is crucial to their success.

As a leader in industrial networking solutions, we understand the complexities of DCI expansion. Contact us today to learn more about how our solutions can help you build a future-proof, scalable, and efficient data center that supports the ever-growing digital landscape.

Industrial IoT

We help you enable IIoT connectivity for operational efficiency and maximum business profits.
Learn more